Service · Full renovation

Full property renovation, planned as one job

When the wiring, the pipework, the bathroom and the floors all need attention, doing them together is usually cheaper and calmer than tackling them one at a time.

Author / technical lead: Bauman Raymond Attila · Last reviewed: 05/11/2026

Living room with indirect-light ceiling and decorative panels; worker on ladder
In short

A full renovation (reforma integral) renews a whole apartment, house or villa in a single coordinated job: services, layout, floors, wet rooms and finishes. One contractor plans the sequence, coordinates every trade and buys the materials if you wish. Electrics and gas are carried out by authorised partner installers. You receive an itemised quote, free of charge, starting from photos and the floor area.

What does a full renovation actually involve?

A full renovation treats the property as one project rather than a list of separate repairs. Everything that sits behind the walls and under the floors is assessed first, because that is what determines how much of the visible finish has to come off. In most resale properties on the Costa del Sol the answer is: quite a lot.

A typical scope looks like this:

  • Strip-out of old tiles, sanitaryware, kitchen units, doors and any partitions that are moving.
  • New services: water supply and waste pipes, the electrical installation and, where relevant, gas — with the regulated parts done by authorised partner installers.
  • Layout work: new partitions in brick or plasterboard, widened openings, built-in storage.
  • Surfaces: plastering, skimming, suspended ceilings, floor screeds where levels need correcting.
  • Finishes: floor and wall tiling, painting, interior doors, bathroom and kitchen fitting.
  • Close-out: a full clean and a walk-through with you before handover.

If you want to see the full list of what can sit inside the scope, our guide on what a full renovation includes breaks it down room by room.

When is a full renovation the right call?

Owners usually arrive at a full renovation for one of three reasons. The property has just been bought and has never been updated. The property has been inherited or let for years and is tired throughout. Or the layout simply does not work any more — a closed kitchen, a dark corridor, a second bathroom that is really a cupboard.

The deciding factor is rarely the look of the place. It is the condition of the hidden services. Original galvanised or lead pipework, a fuse board without modern protection, or damp patches near the bathroom are signs that walls will have to be opened anyway. Once that is the case, it makes little sense to leave the rest untouched and come back to it later.

If you are torn between doing everything and doing only the kitchen and bathroom, our article on how to decide between partial and full renovation sets out the questions to ask, and the partial renovation page explains what a smaller scope looks like.

How is a full renovation organised from day one?

The order of work is fixed by physics rather than preference: what is buried goes in first, what is visible goes in last. We plan the job in phases and give you that plan with the quote, so you know which trade is on site at each stage and why.

  1. Assessment from your photos and floor area, then a visit to check the services and measure up.
  2. Itemised quote with every task on its own line, plus a phased plan.
  3. Choices: tiles, flooring, sanitaryware, kitchen, lighting points. We can source the materials.
  4. Strip-out and removal of debris.
  5. Services laid and checked before anything is closed up.
  6. Masonry, plasterboard and plastering.
  7. Floors, tiling and painting.
  8. Fitting, final clean and handover.

The reasoning behind each step is set out in our guide to the renovation sequence.

What should you check about permits before a full renovation?

In Andalusia, the regional planning law (Ley 7/2021, usually called LISTA) splits building work into two broad routes. Smaller works that need no architect’s project can generally go ahead on a declaración responsable — a formal notification to the town hall in which the owner declares that the work complies with the rules. Larger works, especially those affecting structure, the façade or the use of the building, need a licencia, which is a permit granted before work starts.

A full interior renovation without structural changes often falls on the notification side, but each ayuntamiento sets its own forms, fees and supporting documents, and the boundary depends on the exact scope (to be verified with your town hall in every case). The permit itself is the owner’s step; we tell you what our scope involves so that the description you file matches the work. Our permits guide explains the two routes in plain English.

Can a full renovation change the layout of the property?

Yes, within limits. Non-load-bearing partitions can be removed, moved or rebuilt, which is how a closed kitchen becomes an open-plan living space or a narrow corridor disappears. Brick and plasterboard each have their place: brick for wet rooms and where sound or robustness matters, plasterboard for speed, straight lines and integrated storage.

Load-bearing walls, columns and beams are a different matter. Touching them needs a structural assessment and, as a rule, an architect’s project and a licence. We do not provide technical projects, so if your plans involve structure we will tell you so at the first visit and suggest you speak to an architect or aparejador before we price the job. Our masonry and layout page covers the partition work in more detail.

What does a full renovation quote include, and what does it leave out?

Our quotes are itemised: each task appears with a description, a unit of measure and a quantity. That makes it easy to see where the budget goes and where it could be adjusted. We do not publish prices, because two apartments of identical size can need very different work; the factors that move the figure are explained on presupuestoreforma.eu.

Included in our management: coordinating every trade, materials purchasing if you want it, debris removal and the final clean. Not included: technical projects, licence applications, energy certificates, asbestos removal, new-build work, swimming pools and air-conditioning installation. If any of these are needed alongside the renovation, we say so in writing so there is no grey area.

Official sources

Author / technical lead

Bauman Raymond Attila · Reformas Integrales Málaga · Avenida Antonio Belón 3, Marbella. Last reviewed: 05/11/2026.

FAQ

Frequently asked questions

Is a full renovation the same as a refurbishment?

In everyday British usage, roughly yes. In Spain, reforma integral specifically means renewing the whole property, including the hidden services, not only redecorating.

Do I have to move out during a full renovation?

In most cases it is the sensible choice, because water, power and the kitchen are out of action at different stages. Our guide on living through a renovation explains the trade-offs.

Can you start from photos if I am not in Spain?

Yes. Photos of each room, the fuse board and the bathroom, plus an approximate floor area sent by email or WhatsApp, are enough for a first estimate.

Who carries out the electrical and gas work?

Authorised partner installers, coordinated by us as part of the same job. You keep a single point of contact.

Do you buy the tiles, sanitaryware and flooring?

We can. If you prefer to supply certain items yourself, the itemised quote shows which lines include material and which do not.

Do you prepare the architect’s drawings?

No. If the scope needs a technical project, you will need an architect or aparejador. We tell you at the first visit if we think that applies.

Will you remove asbestos if you find it?

No. Asbestos-cement must be removed by a registered specialist; see retiradauralitamalaga.eu. We stop work in that area until it has been dealt with.

Is there a guarantee?

Yes. We work with a guarantee and public liability insurance. The guarantee terms are written into the quote.

How long will the work take?

It depends on size, scope, material lead times and the permit route. Your quote includes a phased plan for your specific property.

Can a full renovation be split into stages?

It can, but it often costs more because walls and floors get opened twice. We will tell you honestly if phasing makes sense for your property.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?