Guide · Owners’ community

Renovating a flat in a block: working with the comunidad

If your property is in an apartment block or a managed urbanisation, you are part of a comunidad de propietarios. It has a say over some aspects of your renovation — and none over others.

Author / technical lead: Bauman Raymond Attila · Last reviewed: 05/11/2026

Corridor and stair at works stage
In short

Under Spain’s horizontal property law, an owner may alter the architecture, installations or services inside their own flat as long as this does not impair the building’s safety, structure, exterior configuration or other owners’ rights — and must notify whoever represents the community beforehand. Shared elements cannot be changed unilaterally. Working hours, lift use and debris removal are governed by community rules and municipal ordinances.

What is a comunidad de propietarios?

When a building or development is divided into separately owned units, Spanish law treats it as a horizontal property. The owners together form a comunidad de propietarios, which is responsible for the shared parts of the building. It has a president (an owner), usually an administrador (a professional manager) and general meetings where decisions are taken.

For a renovator, the community matters in three ways. It must be told about your works in advance. It controls the shared elements, which you cannot alter without its agreement. And it may have internal rules about working hours, use of lifts and common areas. Most disputes during renovations in apartment blocks arise from one of these three, and almost all of them are avoidable with an early conversation.

What does the law allow you to do inside your own flat?

Article 7.1 of the Ley de Propiedad Horizontal states that the owner of each flat or unit may modify its architectural elements, installations or services provided this does not impair or alter the building’s safety, its general structure, its exterior configuration or condition, or harm the rights of another owner — and that the owner must inform whoever represents the community before carrying out those works.

In plain terms: a new bathroom, a new kitchen, new floors, new partitions and new wiring inside your flat are generally your business, as long as you give notice. Anything touching the structure, the façade or other owners’ property is not. Notice is normally given to the president or the administrador, in writing, with a short description of the works and the expected start date.

Which parts of the building are shared elements?

Shared elements are those that serve the building as a whole. Which ones they are exactly depends on the building’s title and statutes (to be verified for your building), but they typically include:

  • The structure: foundations, columns, beams, floor slabs and load-bearing walls.
  • The façade, including its appearance, and often the window openings and railings.
  • The roof and roof terraces.
  • Main service runs: the shared soil stack, rising water mains and common electrical supplies.
  • Common areas: entrance, stairs, lift, corridors and gardens.

Replacing your section of waste pipe up to the stack is part of your renovation; replacing the stack itself is a community matter. Changing windows or enclosing a terrace often needs community approval as well as town hall permission.

What rules apply to working hours and noise?

Two layers apply. The municipal noise ordinance sets general limits on noisy activities, and the community may have its own internal rules — normas de régimen interior — with stricter working hours, quiet periods or seasonal restrictions. Some coastal developments restrict noisy works during the summer season. Hours and restrictions vary by building and town (to be verified with your administrador and ayuntamiento).

We plan the noisiest tasks — strip-out, cutting chases, breaking tiles — within the permitted hours and, where possible, in a block at the start of the job, so that the disruption to neighbours is concentrated rather than spread out. A short note to neighbours before work starts goes a long way.

How are lifts, common areas and debris handled?

Many communities require lifts to be protected with panels during works, or restrict their use for materials. Some ask for a deposit against damage to common areas. Debris must leave the building without blocking access, and in many towns a skip on the public road needs its own permit from the town hall.

We protect the lift and the route from the entrance to your door, bag debris and take it out at agreed times, and clean the common areas we use at the end of each working day. If your building has a concierge or porter, we coordinate deliveries and access with them. These practical details are often what determine whether your neighbours remember the renovation as tolerable or not.

Does any of this apply to villas and townhouses?

Often, yes. Many villas and townhouses on the Costa del Sol sit within an urbanisation that is itself organised as a community, sometimes with several layers: a sub-community for a group of houses and a main community for the whole development. The same principle applies — your property is yours to renovate inside, but shared roads, gardens, pools, perimeter walls and sometimes the external appearance of the houses are community matters.

Some urbanisations have design rules on façade colours, roof tiles, fences or external lighting, and some require prior notice for any works involving contractors’ vehicles. Ask the administrador for these before you finalise the scope. External work on villas is covered on our sister site reformavillascostadelsol.eu.

How should you prepare before work starts?

  1. Read your community’s statutes and internal rules, or ask the administrador for a summary of anything affecting works.
  2. Write to the president or administrador describing the works and the start date, as article 7.1 requires.
  3. Flag anything touching shared elements — windows, terrace, stack, façade — and seek approval before including it in the scope.
  4. Ask about lift protection, deposits and access times.
  5. File the town hall notification separately; community notice does not replace it. See our permits guide.

We point out, at the first visit, any part of the job that may involve shared elements, so you can raise it with the community before the quote is final. For apartment-specific renovations, our sister site reformapisosmalaga.eu covers logistics in blocks in more depth, and our partial renovation page explains smaller scopes.

Official sources

Author / technical lead

Bauman Raymond Attila · Reformas Integrales Málaga · Avenida Antonio Belón 3, Marbella. Last reviewed: 05/11/2026.

FAQ

Frequently asked questions

Do I need the community’s permission to renovate my flat?

Not for works inside your flat that do not affect structure, exterior or other owners. You must, however, notify the community’s representative beforehand.

Who do I notify?

Whoever represents the community, normally the president, usually through the administrador.

Can I change my windows?

It depends on the building’s statutes and the effect on the façade. Ask the community first, and check town hall requirements too.

Who pays for a leak from the shared soil stack?

The stack is usually a community element, so its repair is normally a community matter. Check your statutes and insurance.

Can the community stop my renovation?

It can act if works affect shared elements, safety or other owners’ rights. Notified interior works within your flat are generally permitted.

Are there summer bans on noisy works?

Some communities and municipalities restrict noisy works in high season (to be verified locally).

Do I need to protect the lift?

Many communities require it. We protect the lift and the access route as standard.

Does the community notice replace the town hall notification?

No. They are separate steps and both may be needed.

Can I enclose my terrace?

Usually not without community approval and a town hall licence, since it changes the façade.

What if a neighbour complains during the works?

We try to resolve practical issues directly. Clear notice and agreed working hours prevent most complaints.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?