Blog · Cost

Renovation price myths worth unlearning

Owners often arrive with a figure in mind from a friend, a forum or a previous job. Some of the beliefs behind those figures cause more trouble than the figures themselves.

Author / technical lead: Bauman Raymond Attila · Last reviewed: 05/11/2026

Suspended ceiling being fitted with framing and boards
In short

Renovation costs are driven by scope, the condition of hidden services, materials, access, occupancy and timing — not by a universal price per square metre. The cheapest quote is often the least complete, phasing can cost more than doing a job once, and a vague quote is not a flexible one. Comparing itemised quotes line by line is the only reliable way to judge cost.

Myth: is there a standard price per square metre?

The figure most often quoted in conversation is a price per square metre for a full renovation. It is a useful shorthand for estate agents, but a poor tool for planning. Two flats of the same size in the same building can need very different work: one with sound plumbing and a recent bathroom, the other with original pipework, damp and a kitchen that needs relocating.

A square-metre figure also hides the biggest swing factor of all, which is the finish level. The same bathroom can be fitted with basic or premium sanitaryware, standard or large-format tiles, a tray or a level-access shower. The work behind them is similar; the cost is not. We explain the factors without figures on presupuestoreforma.eu.

Myth: is the cheapest quote the best value?

Sometimes. More often, the cheapest quote is the least complete. A low total frequently means debris removal, protection or cleaning are missing; waterproofing is not mentioned; materials are “to be confirmed”; or the electrical work is quoted without saying who will do it and under what authorisation.

The test is simple: lay the quotes side by side and compare them line by line. If one contractor lists a task and another does not, ask whether it is included. Our contract and quote guide lists what a complete renovation quote should contain.

Myth: does doing it in phases always save money?

Phasing spreads the spend, which can be the right decision for cash-flow reasons. But it rarely reduces the total. Each phase involves its own setting up, protection, strip-out and clean-up. Worse, if the first phase is finished before the services are renewed, the second phase may have to open walls and floors that were just completed.

If you do phase, put anything buried — pipes, cables, screeds — in the first phase, and the finishes in later ones. Our post on partial or full renovation helps decide where to draw the line.

Myth: is a vague quote more flexible?

A quote with a few lines and a round total can feel easy to work with. In practice, it gives you nothing to hold on to when the scope is questioned. Did “bathroom renovation” include the waste pipes in the floor? The towel rail? The extractor fan? With no line items, every question becomes a negotiation.

An itemised quote is more flexible, not less. Because each task has its own line, you can see exactly what changes if you swap a material, drop a task or add one. Flexibility comes from detail.

Myth: is the first estimate from photos the final price?

A first estimate from photos and an approximate floor area is genuinely useful: it tells you whether the job is in the range you had in mind and whether the contractor is a fit. But photos cannot show what is inside the walls, whether the floor is level or how the building handles access and debris. That is why the final itemised quote follows a visit.

Treat the first estimate as a starting point for a conversation, not a contract. Equally, be wary of a builder who offers a firm price without seeing the property. Either the price includes a generous margin for the unknown, or the unknown will reappear later as extras. Neither helps you budget accurately.

Myth: are labour and materials the whole cost?

They are the visible part. The rest includes access (floor level, lift, distance to parking), debris removal and any skip permit, protection of common areas, coordination time, waiting for materials, and the cost of working around occupants or bookings. Municipal fees and construction tax for the town hall notification or licence are also part of the overall spend, even though they are not part of the builder’s quote.

None of these are hidden if the quote is honest. They are simply easy to forget when you start from a price per square metre. If you want a figure that reflects your property rather than an average, send us photos and the floor area for an itemised quote; our full renovation and partial renovation pages describe what each scope includes.

Author / technical lead

Bauman Raymond Attila · Reformas Integrales Málaga · Avenida Antonio Belón 3, Marbella. Last reviewed: 05/11/2026.

FAQ

Frequently asked questions

Why won’t you publish prices on this site?

Because a published figure would be wrong for most properties. Our quotes are itemised for each job.

Where can I learn what drives renovation costs?

Our network site presupuestoreforma.eu explains the cost factors without quoting figures.

Is a price per square metre useful at all?

Only as a very rough starting point. Scope, services and finish level move the cost far more.

Why do quotes for the same job vary so much?

Usually because they describe different scopes. Compare them line by line.

Does phasing reduce the total cost?

Rarely. It spreads spending but often adds set-up, protection and rework.

Are town hall fees in the builder’s quote?

Not in ours. Fees and construction tax are paid by the owner when filing.

Does supplying my own materials save money?

It can, if you buy well. It also shifts responsibility for quantities and delivery dates to you.

Is the quote free?

Yes, our assessment and quote are free and without obligation.

What information gives the most accurate first estimate?

Photos of every room, the bathroom, kitchen and fuse board, plus the approximate floor area.

What happens to the price if something unexpected appears?

We show you, describe the extra work and price it as its own line before going ahead.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?